Kin Bineola 29SJ 1580 Room: Room 109 Story: 1st Story Year 2006
Capping Mortars
# of buckets Source Material
2.0 Outside park Dirt Cans Cups of color
1.0 Purchase Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
2.0 Outside park Dirt Duraweld C (1:4)
1.0 Purchase Sand Duraweld (other)
Clay
Comments:
Walls recorded: West, North
Start: 12/4/2006 End: 12/4/2006 Person Days: 0.5
 
Overall Comments:



Kin Bineola 29SJ 1580 Room: Room 109 Story: 1st Story Wall: West Interior Year 2006
Condition
Photo type: Before 82419
Image #: 082419
Catalog #: 85197        Accession #: 803
Condition:
Mortar Erosion: Poor
Other Conditions:
     Mortar Erosion Poor








Kin Bineola 29SJ 1580 Room: Room 109 Story: 1st Story Wall: West Interior Year 2006
Treatment
Photo type: After
Image #: 075781
Catalog #: 85197        Accession #: 803
Treatment:
Repointing (sq ft): 4.0
Stone replaced (#): 45.0
Mortar (# buckets): 4.0
Treatment comment: Garry Joe and Paul Tso worked in this room.
Other Treatment:
     Replaced Mortar








Kin Bineola 29SJ 1580 Room: Room 109 Story: 1st Story Wall: North Interior Year 2006
Condition
Photo type: Before 82418
Image #: 082418
Catalog #: 85197        Accession #: 803
Condition:
Other Conditions:
     Basal Erosion (mortar/stone) Poor








Kin Bineola 29SJ 1580 Room: Room 109 Story: 1st Story Wall: North Interior Year 2006
Treatment
Photo type: After
Image #: 075780
Catalog #: 85197        Accession #: 803
Treatment:
Repointing (sq ft): 43.0
Masonry: 12.0
Stone replaced (#): 2.0
Mortar (# buckets): 3.0
Treatment comment: Garry Joe and Paul Tso worked in this room.
Other Treatment:
     Replaced Mortar
     Replaced Stone(s)