Bc 51 29SJ 395 Room: Room 18 Story: 1st Story Year 1979
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
3.0 Dirt Duraweld C (1:4)
1.0 Sand Duraweld (other)
Clay
Comments:
Walls recorded: West
Start: 4/9/1979 End: 4/9/1979 Person Days: 1.0
 
Overall Comments:



Bc 51 29SJ 395 Room: Room 18 Story: 1st Story Wall: West Interior Year 1979
Condition
Photo type: Before
Image #: 070861
Catalog #: 66777        Accession #: 744
Condition:
Other Conditions:
     Mortar Erosion
     Repatch wall
     Needs Repointing
     Basal Erosion








Bc 51 29SJ 395 Room: Room 18 Story: 1st Story Wall: West Interior Year 1979
Treatment
Photo type: After
Image #: 070862
Catalog #: 66777        Accession #: 744
Treatment:
Other Treatment:
     Repaired Basal erosion (mortar/stone)
     Repatched Wall
     Repointing completed
     Replaced Mortar