Kin Bineola 29SJ 1580 Room: Room 29 Story: 1st Story Year 2006
Capping Mortars
# of buckets Source Material
2.0 Outside park Dirt Cans Cups of color
1.0 Purchase Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
2.0 Outside park Dirt Duraweld C (1:4)
1.0 Purchase Sand Duraweld (other)
Clay
Comments:
Walls recorded: South, East
Start: 18/4/2006 End: 18/4/2006 Person Days: 0.5
 
Overall Comments:



Kin Bineola 29SJ 1580 Room: Room 29 Story: 1st Story Wall: South Interior Year 2006
Treatment
Treatment:
Treatment comment: Paul Tso worked in this room.








Kin Bineola 29SJ 1580 Room: Room 29 Story: 1st Story Wall: South Interior Year 2006
Condition
Photo type: Before 75806
Image #: 075806
Catalog #: 85197        Accession #: 803
Condition:
Mortar Erosion: Poor
Other Conditions:
     Mortar Erosion Poor








Kin Bineola 29SJ 1580 Room: Room 29 Story: 1st Story Wall: East Interior Year 2006
Condition
Photo type: Before 82396
Image #: 082396
Catalog #: 85197        Accession #: 803
Condition:
Mortar Erosion: Poor
Other Conditions:
     Mortar Erosion Poor








Kin Bineola 29SJ 1580 Room: Room 29 Story: 1st Story Wall: East Interior Year 2006
Treatment
Photo type: After 75759
Image #: 075759
Catalog #: 85197        Accession #: 803
Treatment:
Repointing (sq ft): 12.0
Masonry: 1.0
Mortar (# buckets): 0.5
Treatment comment: Paul Tso worked in this room.
Other Treatment:
     Replaced Mortar