Bc 50-Tseh So 29SJ 394 Room: Room 16 Story: 1st Story Year 1981
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: West
Start: 21/5/1981 End: 21/5/1981 Person Days: 0.5
 
Overall Comments:



Bc 50-Tseh So 29SJ 394 Room: Room 16 Story: 1st Story Wall: West Interior Year 1981
Condition
Photo type: Before
Image #: 071693
Catalog #: 94670        Accession #: 745
Condition:
Mortar Erosion: Poor
Other Conditions:
     Basal Erosion (stone) Poor
     Mortar Erosion Poor








Bc 50-Tseh So 29SJ 394 Room: Room 16 Story: 1st Story Wall: West Interior Year 1981
Treatment
Photo type: After
Image #: 071694
Catalog #: 94670        Accession #: 745
Treatment:
Treatment comment: Patching and grouting the wall was done in soil cement mortar of 3 parts soil, 1 part sand and 1 part cement.
Other Treatment:
     Repaired Basal erosion (mortar/stone)
     Replaced Mortar