Chetro Ketl 29SJ 1928 Room: Room 140 Story: 2nd Story Year 1980
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: North
Start: 22/8/1980 End: 26/8/1980 Person Days: 4.0
 
Overall Comments:



Chetro Ketl 29SJ 1928 Room: Room 140 Story: 2nd Story Wall: North Exterior Year 1980
Condition
Photo type: Before
Image #: 071458
Catalog #: 94665        Accession #: 745
Condition:
Mortar Erosion: Extreme
Other Conditions:
     Veneer Stone Erosion Fair
     Respalling Poor
     Repatch wall Poor
     Needs Repointing Poor
     Mortar Erosion Extreme








Chetro Ketl 29SJ 1928 Room: Room 140 Story: 2nd Story Wall: North Exterior Year 1980
Treatment
Photo type: After
Image #: 071459
Catalog #: 94665        Accession #: 745
Treatment:
Treatment comment: Grouting and respalling the wall was done in soil cement mortar of 3 parts soil, 1 part sand and 1 part cement.
Other Treatment:
     Repointing completed
     Respalling Completed
     Repatched Wall
     Replaced Veneer stone erosion
     Replaced Mortar