Chetro Ketl 29SJ 1928 Room: Room 63 Story: 1st Story Year 1980
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: West, South, East, North
Start: 29/7/1980 End: 28/8/1980 Person Days: 5.0
 
Overall Comments:



Chetro Ketl 29SJ 1928 Room: Room 63 Story: 1st Story Wall: West Interior Year 1980
Condition
Photo type: Before
Image #: 071422
Catalog #: 94665        Accession #: 745
Condition:
Mortar Erosion: Extreme
Other Conditions:
     Mortar Erosion Extreme
     Respalling Poor
     Loose and cracked Wall Poor
     Veneer Stone Erosion Extreme








Chetro Ketl 29SJ 1928 Room: Room 63 Story: 1st Story Wall: West Interior Year 1980
Treatment
Photo type: After
Image #: 071423
Catalog #: 94665        Accession #: 745
Treatment:
Treatment comment: Patching and grouting the wall was done in soil cement mortar of 3 parts soil, 1 part sand and 1 part cement.
Other Treatment:
     Replaced Mortar
     Repaired loose and cracked wall
     Replaced Veneer stone erosion
     Respalling Completed








Chetro Ketl 29SJ 1928 Room: Room 63 Story: 1st Story Wall: South Interior Year 1980
Condition
Photo type: Before
Image #: 071416
Catalog #: 94665        Accession #: 745
Condition:
Mortar Erosion: Extreme
Basal Erosion: Light
Other Conditions:
     Respalling Poor
     Basal Erosion Light
     Needs Repointing Poor
     Mortar Erosion Extreme
     Eroded Stone(s) Extreme
     Loose or fallen wall caps Poor








Chetro Ketl 29SJ 1928 Room: Room 63 Story: 1st Story Wall: South Interior Year 1980
Treatment
Photo type: After
Image #: 071417
Catalog #: 94665        Accession #: 745
Treatment:
Treatment comment: Patching and grouting the wall was done in soil cement mortar of 3 parts soil, 1 part sand and 1 part cement.
Other Treatment:
     Repaired Basal erosion (mortar/stone)
     Repointing completed
     Replaced Stone(s)
     Respalling Completed
     Reset the Capping Stone(s)
     Replaced Mortar








Chetro Ketl 29SJ 1928 Room: Room 63 Story: 1st Story Wall: East Interior Year 1980
Condition
Photo type: Before
Image #: 071420
Catalog #: 94665        Accession #: 745
Condition:
Mortar Erosion: Extreme
Basal Erosion: Poor
Other Conditions:
     Needs Repointing Poor
     Mortar Erosion Extreme
     Eroded Stone(s) Fair
     Basal Erosion Poor
     Respalling Poor








Chetro Ketl 29SJ 1928 Room: Room 63 Story: 1st Story Wall: East Interior Year 1980
Treatment
Photo type: After
Image #: 071421
Catalog #: 94665        Accession #: 745
Treatment:
Treatment comment: Patching and grouting the wall was done in soil cement mortar of 3 parts soil, 1 part sand and 1 part cement.
Other Treatment:
     Replaced Stone(s)
     Repointing completed
     Replaced Mortar
     Repaired Basal erosion (mortar/stone)
     Respalling Completed








Chetro Ketl 29SJ 1928 Room: Room 63 Story: 1st Story Wall: North Interior Year 1980
Condition
Photo type: Before
Image #: 071418
Catalog #: 94665        Accession #: 745
Condition:
Mortar Erosion: Extreme
Basal Erosion: Light
Other Conditions:
     Respalling Poor
     Eroded Stone(s) Light
     Basal Erosion Light
     Mortar Erosion Extreme
     Needs Repointing Poor








Chetro Ketl 29SJ 1928 Room: Room 63 Story: 1st Story Wall: North Interior Year 1980
Treatment
Photo type: After
Image #: 071419
Catalog #: 94665        Accession #: 745
Treatment:
Treatment comment: Patching and grouting the wall was done in soil cement mortar of 3 parts soil, 1 part sand and 1 part cement.
Other Treatment:
     Repointing completed
     Repaired Basal erosion (mortar/stone)
     Replaced Stone(s)
     Replaced Mortar
     Respalling Completed