Wijiji 29SJ 577 Room: Room 8 Story: 2nd Story Year 2008
Capping Mortars
# of buckets Source Material
1.0 Outside park Dirt Cans Cups of color
5.0 Purchase Sand Describe Color: Brown
Clay Duraweld-C (1:4)
2.0 Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
4.0 Outside park Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: South, North
Start: 25/9/2008 End: 30/9/2008 Person Days: 4.0
 
Overall Comments:



Wijiji 29SJ 577 Room: Room 8 Story: 2nd Story Wall: South Interior Year 2008
Condition
Photo type: Before 84428
Image #: 084428
Catalog #: 93904        Accession #: 811
Condition:
Loose wall caps: Poor
Mortar Erosion: Poor
Other Conditions:
     Basal Erosion (mortar/stone) Poor
     Mortar Erosion Poor
     Loose and cracked Wall Caps Poor








Wijiji 29SJ 577 Room: Room 8 Story: 2nd Story Wall: South Interior Year 2008
Treatment
Photo type: After 84604
Image #: 084604
Catalog #: 93904        Accession #: 811
Treatment:
Stone replaced (#): 13.0
Capping: 14.0
Mortar (# buckets): 9.5
Treatment comment: Harold Suina, James Yazzie and Garry Joe all worked int his room.
Other Treatment:
     Repaired loose and cracked wall
     Replaced Mortar
     Repaired Basal erosion (mortar/stone)








Wijiji 29SJ 577 Room: Room 8 Story: 2nd Story Wall: North Interior Year 2008
Condition
Photo type: Before 84426
Image #: 084426
Catalog #: 93904        Accession #: 811
Condition:
Mortar Erosion: Poor
Other Conditions:
     Mortar Erosion Poor
     Basal Erosion (mortar/stone) Poor








Wijiji 29SJ 577 Room: Room 8 Story: 2nd Story Wall: North Interior Year 2008
Treatment
Photo type: After 84603
Image #: 084603
Catalog #: 93904        Accession #: 811
Treatment:
Repointing (sq ft): 22.0
Stone replaced (#): 51.0
Capping: 14.0
Mortar (# buckets): 14.0
Treatment comment: Harold Suina, James Yazzie and Garry Joe all worked in this room.
Other Treatment:
     Replaced Mortar
     Repaired Basal erosion (mortar/stone)