Chetro Ketl 29SJ 1928 Room: Room 10 Story: 1st Story Year 1980
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: South, North
Start: 20/8/1980 End: 20/8/1980 Person Days: 1.0
 
Overall Comments:



Chetro Ketl 29SJ 1928 Room: Room 10 Story: 1st Story Wall: South Interior Year 1980
Condition
Photo type: Before
Image #: 071396
Catalog #: 94665        Accession #: 745
Condition:
Mortar Erosion: Poor
Basal Erosion: Extreme
Other Conditions:
     Needs Repointing Poor
     Basal Erosion Extreme
     Repatch wall Poor
     Mortar Erosion Poor
     Eroded Stone(s) Extreme








Chetro Ketl 29SJ 1928 Room: Room 10 Story: 1st Story Wall: South Interior Year 1980
Treatment
Photo type: After
Image #: 071397
Catalog #: 94665        Accession #: 745
Treatment:
Treatment comment: Patching and grouting the wall was done in soil cement mortar of 3 parts soil, 1 part sand and 1 part cement.
Other Treatment:
     Repatched Wall
     Repointing completed
     Repaired Basal erosion (mortar/stone)
     Replaced Stone(s)
     Replaced Mortar








Chetro Ketl 29SJ 1928 Room: Room 10 Story: 1st Story Wall: North Interior Year 1980
Condition
Photo type: Before
Image #: 071394
Catalog #: 94665        Accession #: 745
Condition:
Mortar Erosion: Poor
Basal Erosion: Extreme
Other Conditions:
     Basal Erosion Extreme
     Mortar Erosion Poor
     Repatch wall Poor








Chetro Ketl 29SJ 1928 Room: Room 10 Story: 1st Story Wall: North Interior Year 1980
Treatment
Photo type: After
Image #: 071395
Catalog #: 94665        Accession #: 745
Treatment:
Treatment comment: Patching and grouting the wall was done in soil cement mortar of 3 parts soil, 1 part sand and 1 part cement.
Other Treatment:
     Repaired Basal erosion (mortar/stone)
     Replaced Mortar
     Repatched Wall