Pueblo Bonito 29SJ 387 Room: Room 340 Story: 1st Story Year 2006
Capping Mortars
# of buckets Source Material
1.0 Outside park Dirt Cans Cups of color
2.0 Purchase Sand Describe Color: Brown
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
4.0 Outside park Dirt Duraweld C (1:4)
1.0 Purchase Sand Duraweld (other)
Clay
Comments:
Walls recorded: East, North
Start: 13/7/2006 End: 19/7/2006 Person Days: 3.0
 
Overall Comments:



Pueblo Bonito 29SJ 387 Room: Room 340 Story: 1st Story Wall: East Interior Year 2006
Condition
Photo type: Before 75734
Image #: 075734
Catalog #: 85200        Accession #: 803
Condition:
Other Conditions:
     Basal Erosion (mortar/stone) Poor








Pueblo Bonito 29SJ 387 Room: Room 340 Story: 1st Story Wall: East Interior Year 2006
Treatment
Photo type: After 82852
Image #: 082852
Catalog #: 85200        Accession #: 803
Treatment:
Repointing (sq ft): 21.0
Stone replaced (#): 10.0
Stone fresh: 11.0
Mortar (# buckets): 5.0
Treatment comment: Paul Tso worked in this room.
Other Treatment:
     Repaired Basal erosion (mortar/stone)








Pueblo Bonito 29SJ 387 Room: Room 340 Story: 1st Story Wall: North Interior Year 2006
Condition
Photo type: Before 75733
Image #: 075733
Catalog #: 85200        Accession #: 803
Condition:
Other Conditions:
     Basal Erosion (mortar/stone) Poor








Pueblo Bonito 29SJ 387 Room: Room 340 Story: 1st Story Wall: North Interior Year 2006
Treatment
Photo type: After 82850
Image #: 082850
Catalog #: 85200        Accession #: 803
Treatment:
Repointing (sq ft): 24.0
Stone replaced (#): 4.0
Mortar (# buckets): 2.5
Treatment comment: Paul Tso worked in this room.
Other Treatment:
     Repaired Basal erosion (mortar/stone)








Pueblo Bonito 29SJ 387 Room: Room 340 Story: 1st Story Wall: North Interior Year 2006
Treatment
Photo type: After 82851
Image #: 082851
Catalog #: 85200        Accession #: 803
Treatment:
Repointing (sq ft): 24.0
Stone replaced (#): 4.0
Mortar (# buckets): 2.5
Treatment comment: Paul Tso worked in this room.
Other Treatment:
     Repaired Basal erosion (mortar/stone)