Wijiji 29SJ 577 Room: Room 6 Story: 1st Story Year 2008
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
4.0 Outside park Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: West
Start: 1/10/2008 End: 28/10/2008 Person Days: 2.5
 
Overall Comments:



Wijiji 29SJ 577 Room: Room 6 Story: 1st Story Wall: West Exterior Year 2008
Condition
Photo type: Before 84417
Image #: 084417
Catalog #: 93904        Accession #: 811
Condition:
Other Conditions:
     Eroded Stone(s) Poor
     Basal Erosion (mortar/stone) Poor








Wijiji 29SJ 577 Room: Room 6 Story: 1st Story Wall: West Exterior Year 2008
Treatment
Photo type: After 84602
Image #: 084602
Catalog #: 93904        Accession #: 811
Treatment:
Repointing (sq ft): 7.6
Stone replaced (#): 3.0
Mortar (# buckets): 2.0
Treatment comment: Garry Joe worked in this room.
Other Treatment:
     Repaired Basal erosion (mortar/stone)
     Replaced Stone(s)