Chetro Ketl 29SJ 1928 Room: Room 92 Story: 2nd Story Year 2005
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
6.0 Outside park Dirt Duraweld C (1:4)
3.0 Purchase Sand Duraweld (other)
Clay
Comments:
Walls recorded: East, North
Start: 21/11/2005 End: 22/11/2005 Person Days: 2.0
 
Overall Comments:



Chetro Ketl 29SJ 1928 Room: Room 92 Story: 2nd Story Wall: East Interior Year 2005
Condition
Photo type: Before 75910
Image #: 075910
Catalog #: 85205        Accession #: 791
Condition:
Mortar Erosion: Poor
Other Conditions:
     Mortar Erosion Poor
     Basal Erosion (mortar/stone) Poor








Chetro Ketl 29SJ 1928 Room: Room 92 Story: 2nd Story Wall: East Interior Year 2005
Treatment
Photo type: After 75943
Image #: 075943
Catalog #: 85205        Accession #: 791
Treatment:
Repointing (sq ft): 6.0
Masonry: 12.0
Stone replaced (#): 6.0
Mortar (# buckets): 2.0
Treatment comment: Paul Tso, Jack Trujillo, John Atencio Jr. and Garry Joe all worked in this room.
Other Treatment:
     Replaced Mortar
     Repaired Basal erosion (mortar/stone)








Chetro Ketl 29SJ 1928 Room: Room 92 Story: 2nd Story Wall: North Interior Year 2005
Condition
Photo type: Before 75911
Image #: 075911
Catalog #: 85205        Accession #: 791
Condition:
Mortar Erosion: Poor
Other Conditions:
     Mortar Erosion Poor








Chetro Ketl 29SJ 1928 Room: Room 92 Story: 2nd Story Wall: North Interior Year 2005
Treatment
Photo type: After 75942
Image #: 075942
Catalog #: 85205        Accession #: 791
Treatment:
Repointing (sq ft): 15.0
Masonry: 2.0
Stone replaced (#): 4.0
Mortar (# buckets): 8.0
Treatment comment: Paul Tso, Jack Trujillo, John Atencio Jr. and Garry Joe all worked in this room.
Other Treatment:
     Replaced Mortar