Pueblo Pintado 29Mc 166 Room: Room 34 B Story: 1st Story Year 2008
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
4.0 Outside park Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: East
Start: 4/9/2008 End: 4/9/2008 Person Days: 0.5
 
Overall Comments:



Pueblo Pintado 29Mc 166 Room: Room 34 B Story: 1st Story Wall: East Interior Year 2008
Condition
Photo type: Before 84230
Image #: 084230
Catalog #: 93902        Accession #: 811
Condition:
Other Conditions:
     Basal Erosion (mortar/stone) Poor








Pueblo Pintado 29Mc 166 Room: Room 34 B Story: 1st Story Wall: East Interior Year 2008
Treatment
Photo type: After 84402
Image #: 084402
Catalog #: 93902        Accession #: 811
Treatment:
Repointing (sq ft): 14.2
Stone replaced (#): 2.0
Mortar (# buckets): 0.75
Treatment comment: Garry Joe worked in this room.
Other Treatment:
     Repaired Basal erosion (mortar/stone)