Bc 51 29SJ 395 Room: Room 3 Story: 1st Story Year 2007
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
3.0 Outside park Dirt Duraweld C (1:4)
0.5 Purchase Sand Duraweld (other)
Clay
Comments:
Walls recorded: South, North
Start: 17/10/2007 End: 18/10/2007 Person Days: 1.5
 
Overall Comments:



Bc 51 29SJ 395 Room: Room 3 Story: 1st Story Wall: South Interior Year 2007
Treatment
Photo type: After 83704
Image #: 083704
Catalog #: 89999        Accession #: 806
Treatment:
Repointing (sq ft): 12.0
Stone replaced (#): 5.0
Mortar (# buckets): 1.5
Treatment comment: Paul Tso worked in this room.








Bc 51 29SJ 395 Room: Room 3 Story: 1st Story Wall: North Interior Year 2007
Condition
Photo type: Before 83576
Image #: 083576
Catalog #: 89999        Accession #: 806
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor








Bc 51 29SJ 395 Room: Room 3 Story: 1st Story Wall: North Interior Year 2007
Treatment
Photo type: After 83703
Image #: 083703
Catalog #: 89999        Accession #: 806
Treatment:
Repointing (sq ft): 14.0
Stone replaced (#): 6.0
Mortar (# buckets): 1.5
Treatment comment: Paul Tso worked in this room.