Pueblo Bonito 29SJ 387 Room: Room 165 Story: 1st Story Year 2008
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
6.0 Outside park Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: West
Start: 24/4/2008 End: 24/4/2008 Person Days: 1.0
 
Overall Comments:



Pueblo Bonito 29SJ 387 Room: Room 165 Story: 1st Story Wall: West Exterior Year 2008
Treatment
Photo type: After
Image #: 084121
Catalog #: 90103        Accession #: 811
Treatment:
Repointing (sq ft): 10.0
Stone fresh: 25.0
Mortar (# buckets): 4.0
Treatment comment: Harold Suina worked in this room.
Other Treatment:
     Replaced Mortar








Pueblo Bonito 29SJ 387 Room: Room 165 Story: 1st Story Wall: West Exterior Year 2008
Treatment
Photo type: After Backfill 84161
Image #: 084161
Catalog #:        Accession #:
Treatment:








Pueblo Bonito 29SJ 387 Room: Room 165 Story: 1st Story Wall: West Exterior Year 2008
Treatment
Photo type: Before Backfill 83954
Image #: 083954
Catalog #:        Accession #:
Treatment:








Pueblo Bonito 29SJ 387 Room: Room 165 Year 2008
Backfill
Start: 2008 End: 2008 Person days:
Comments: backfill document has no other detail
Specific Information

Cubic yards of fill:
Backfill source type:
Backfill other:
Cloth barrier type:
Cloth barrier other:
Other textile type:
Other textile other:
Other textile purpose:
Drain Information

Inlet:
T: L: Other: Other type:
Joint:
Y: 90: 45: 22: Other: Other type:
Drain pipe length: feet      Drain pipe diameter: inches
Avgerage height above geotextile: feet     
Drain pipe enters room through:      Other:
Drain pipe leaves room through:      Other:
Drain pipe leaves goes to:     
Evaporative Basins

Basin installed
Height above geotextile:
Basin size:
Capacity: gallons
Wood

Number of pieces buried:
Note: