Una Vida 29SJ 391 Room: Room 58 Story: 1st Story Year 2005
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
8.0 Outside park Dirt Duraweld C (1:4)
4.0 Purchase Sand Duraweld (other)
Clay
Comments:
Walls recorded: North
Start: 29/3/2005 End: 29/3/2005 Person Days: 0.5
 
Overall Comments:



Una Vida 29SJ 391 Room: Room 58 Story: 1st Story Wall: North Interior Year 2005
Treatment
Photo type: After 82241
Image #: 082241
Catalog #: 85210        Accession #: 791
Treatment:
Masonry: 2.0
Stone replaced (#): 20.0
Mortar (# buckets): 2.5
Treatment comment: Paul Tso and Garry Joe both worked in this room.
Other Treatment:
     Reset Loose, Leaning, Bulging Lintel Stones
     Repaired Basal erosion (mortar/stone)








Una Vida 29SJ 391 Room: Room 58 Story: 1st Story Wall: North Interior Year 2005
Treatment
Photo type: After 82240
Image #: 082240
Catalog #: 85210        Accession #: 791
Treatment:
Masonry: 2.0
Stone replaced (#): 20.0
Mortar (# buckets): 2.5
Treatment comment: Paul Tso and Garry Joe both worked in this room.
Other Treatment:
     Reset Loose, Leaning, Bulging Lintel Stones
     Repaired Basal erosion (mortar/stone)