Bc 50-Tseh So 29SJ 394 Room: Room 6 Story: 1st Story Year 1979
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
3.0 Dirt Duraweld C (1:4)
1.0 Sand Duraweld (other)
Clay
Comments:
Walls recorded: South
Start: 10/8/1979 End: 13/8/1979 Person Days: 1.5
 
Overall Comments:



Bc 50-Tseh So 29SJ 394 Room: Room 6 Story: 1st Story Wall: South Interior Year 1979
Condition
Photo type: Before
Image #: 070767
Catalog #: 66777        Accession #: 744
Condition:
Other Conditions:
     Repatch wall
     Loose Stone(s)
     Loose and cracked Wall Caps
     Basal Erosion
     Mortar Erosion








Bc 50-Tseh So 29SJ 394 Room: Room 6 Story: 1st Story Wall: South Interior Year 1979
Treatment
Photo type: After
Image #: 070768
Catalog #: 66777        Accession #: 744
Treatment:
Other Treatment:
     Replaced Mortar
     Replaced Capping Stone(s)
     Reset the Stone(s)
     Repaired Basal erosion (mortar/stone)
     Repatched Wall